Welcome to McLendon Hydrology

Project Gallery

Our Projects

Multi-family- Garland

Prepared downstream assessment study. Evaluated the downstream effects of removing a severely undersized culvert crossing. Evaluated valley-storage restoration that involved removal of excess fill materials. Evaluated structural measures to control incising along creek. Remapped Stream 2I4 with new hydrologic and hydraulic analyses with LOMR submittal through FEMA.

55+ condominiums - San Marcos

Prepared downstream impact study on Stream CC-1 of San Marcos River

Prepared Watershed Protection Plan 

Independent senior living -Plano

Prepared pre-project flood study that supported reclamation, valley-storage mitigation, bridge crossing, culvert augmentation and two (2) post-construction Letters of Map Revision (LOMR) through FEMA

© 2025 All Rights Reserved by Negotia Now, Crafted by NegotiaNow.com